Building with overhangs clad in gray composite panels

Mounting System · Concealed Fastening

Tray mounted on a composite panel

In the hanging system, or “bota,” the panel is machined into trays that are hung from brackets attached to the studs. Concealed fastening, horizontal or vertical modularity, and large trays with stiffeners.

  • Concealed Mounting, Suspended
  • Trays> 700 mm high
  • 40 or 45 mm flange
  • Stiles up to ≈ 1,200 mm, as calculated

Hanging Tray

Hanging trays with no visible fasteners

In the hanging or “boot” system, each piece of composite panel becomes a tray: the perimeter flanges are milled and folded, and notches (the “boots”) are cut into the vertical edges so the tray can hang from brackets clipped onto the rails. A screw through the top flange holds it in place, and all you see on the facade is the joint between trays.

It is the system of choice for tall trays and for facades with a vertical or horizontal layout. Installation runs from the bottom up and is quick: hang, level and screw, and each tray can later be unhooked for repairs or to reach building services. At StarModul we fabricate the trays in our workshop with CNC cutting and milling, formed corners, hanging reinforcements and, on large pieces, stiffeners sized to the wind calculation, and ship them numbered and ready to hang.

  • Mounting: Hidden, suspended
  • Trays: > 700 mm high
  • Flange: 40 or 45 mm
  • Uprights: Up to ≈ 1,200 mm, as calculated
Gray composite panel facade under construction

Concealed mounting

How the Hanging Tray Works

In the hanging system, or “boot” system, the composite panel is machined into trays: the perimeter flanges are milled and folded, and notches (the “boots”) are cut into the vertical edges. Each tray is hung from brackets clipped onto the studs and secured at the top with a screw. No fasteners are visible.

  • Horizontal or vertical modulation.
  • Suitable for trays over 700 mm high.
  • Large trays with stiffeners attached to the back.
  • Quick installation: Hang the tray, level it, and screw it in place.
Diagram of the composite panel-mounted tray system
Trays hanging from brackets on the uprights.

Components

System Components

1

Corner brackets and shims

Aluminum or stainless steel L-shaped spacers anchored to the wall; optional insulating shims to break the thermal bridge.

2

Stiles

Vertical aluminum profiles in a T or omega shape at the joints, and in an L shape at intermediate points.

3

Hanging Brackets

They clip onto the upright for adjustment and are secured with two self-tapping screws.

4

Tray

40- or 45-mm flanges, corners formed with riveted plates, and reinforcements on each boot.

5

Stiffeners

Vertical members (glued and riveted on the inside) or a horizontal profile: these allow for larger trays and wider spacing between uprights.

6

Bottom clip

Secure the tray from below to the intermediate rails and help align it.

With a horizontal brace, the spacing between studs can be up to about 1,200 mm, depending on the site's wind load calculations.

Workshop

How the Tray Is Made

  1. CNC cutting and milling. Cut along the unfolded outline and mill the back side along the fold lines, leaving 0.8 mm of material for folding.
  2. Folding the flanges. The tabs are bent at a 90° angle; the corners are secured with metal plates and rivets.
  3. Hanging brackets. On trays with a 40-mm flange, a reinforcement is riveted to each end (4 rivets at the corners, 2 at the other points).
  4. Stiffeners. If the tray is large, sand, clean, and prime the area, then attach the stiffener using double-sided tape with elastic adhesive; finally, rivet it to the flanges.

We perform all of this machining in our workshop: see composite panel machining.

Construction details

Details of the hanging tray

Horizontal cross-section of the suspended tray system
Horizontal section
Vertical section of the suspended tray system
Vertical section
Detail of a crown with a composite hanging tray
Coronation
Detail of a foundation with a composite hanging tray
Startup
Detail of a lintel with a composite hanging tray
Lintel

System Specifications

Components and Dimensions of the Hanging Tray

ElementDetail
Spacers6063 T5 aluminum double-T profile available in 14 lengths (from 59 to 254 mm, in 15-mm increments) or in a U-shape. Optional insulating spacer between the spacer and the wall to break the thermal bridge.
Separator–Upright JointM6 × 60/70 mm through-bolt, with 15 mm of adjustment for plumb alignment.
Stiles6063 T5 aluminum omega profile. First and last fasteners must be no more than 250 mm from the ends of the profile.
Hanging bracketExtruded 6063 T5 aluminum part with an EPDM gasket to dampen vibrations (wind, traffic). It clips onto the omega bracket, slides up or down to the boot position, and is secured with self-tapping screws.
Tray with a 45 mm flangeCorners reinforced with 28 × 33 × 2 mm 1050 H24 aluminum angle stock and rivets. The long flange extends further into the omega profile and channels water more effectively.
Tray with a 40 mm flangeEach boot has a 2-mm aluminum hanging reinforcement. It uses less panel material for the flanges.
Top MountingScrews or rivets through the through holes in the upper flange, against the wings of the omega.
Forming Rivets4.8 × 15 mm blind rivet, aluminum/stainless steel.
StiffenersAngled composite profile glued (double-sided tape + adhesive) and riveted to the flanges. Six sizes depending on the length of the tray: < 750 · 750–1,500 · 1,500–2,400 · 2,400–4,000 · 4,000–5,000 · > 5,000 mm.
Distance from wall to panel faceFrom 100 to 310 mm, depending on the spacer.
Assembly OrderFrom bottom to top.

Separator and Insulation

The spacer is selected based on the insulation thickness and the wall's camber, always leaving a 30-mm air gap:

Spacer (mm)597489104119149179209254
Insulation (mm)30506080100120160180230

Replacing a Damaged Tray

  1. Cut along the top tab to remove the damaged tray.
  2. A 30 × 20 mm L-shaped profile is screwed to the omega using 4.2 × 13 mm stainless steel screws.
  3. Double-sided tape and adhesive are applied to the L-shaped profile.
  4. Install the new tray, along with a special 9-mm hanging bracket and its reinforcements.

Frequently asked questions

Questions About the Hanging Tray

How big can a hanging tray be?

It depends on the slab width, wind conditions, and stiffeners. Slabs taller than 700 mm are typical for this system; for larger sizes, stiffeners are added as calculated.

Can a tray be removed?

Yes: Remove the top screw and take it off, which makes repairs or access to the interior easier.

Hanging tray or male-female?

The female connector works best with tall shelves and vertical configurations; the male-female connector works best with horizontal shelves up to 700 mm high and curved facades.

Estimate for a facade with trays

We'll take your facade apart and send you the pre-assembled panels, ready to hang.